| Notes:
1] Provide step flashing minimum 4“ (100mm) extending up the wall.
2] Provide EIFS overlap of the step flashing 2” (50mm) and terminate EIFS minimum 2“ (50mm) above the finished roof. The space permits re-roofing at a future date and helps prevent debris from accumulating between roof and EIFS.
3] Terminate the step flashing with a water-tight diverter (kick-out) flashing to direct water into the gutter. Refer to Sto detail 2.62b on fabrication of a diverter flashing.
4] Provide a 1/2” (13mm) joint around the diverted flashing and seal with sealant and backer-rod.
|