KICKOUT FLASHINGS
STUCCO - STO CORPORATION

Sto Corp. is one of the largest stucco manufacturers in the U.S.A. and they have a website full of great information. They also have a large library of installation details on their website. Their site can be found at http://www.stocorp.com.

Specifically, the Sto details 5.62 and 2.62 (see below) clearly show the kickout flashing and how it should be installed with both traditional stucco and EIFS synthetic stucco systems.

Sto 5.62 - Roof/Wall Diverter Flashing - Hardcoat Stucco

Notes:

1] Provide step flashing minimum 4“ (100 mm) extending up the wall.

2] Provide stucco overlap of the step flashing 2” (50mm) and terminate stucco minimum 2“ (50 mm) above the finished roof. The space permits re-roofing at a future date and helps prevent debris from accumulating between roof and stucco.

3] Terminate the step flashing with a watertight diverter (kick-out) flashing to direct water into the gutter. Refer to Sto detail 2.62b on fabrication of a diverter flashing.

4] Provide a 3/8” (10 mm) joint around the diverter flashing and seal.

Sto 2.62b - Field Fabrication of Diverter Flashing

Notes:

1] Detail shows one method of field fabricating a diverter flashing . Adjust angle based on pitch of roof. Refer to Sto detail 2.62a for installation.

Notes:

1] Provide step flashing minimum 4“ (100mm) extending up the wall.

2] Provide EIFS overlap of the step flashing 2” (50mm) and terminate EIFS minimum 2“ (50mm) above the finished roof. The space permits re-roofing at a future date and helps prevent debris from accumulating between roof and EIFS.

3] Terminate the step flashing with a water-tight diverter (kick-out) flashing to direct water into the gutter. Refer to Sto detail 2.62b on fabrication of a diverter flashing.

4] Provide a 1/2” (13mm) joint around the diverted flashing and seal with sealant and backer-rod.

The above detail is a good illustration for the kickout flashing, but poor for the 2” above roof termination described in step 2 above.

Please enter your comments in the space provided below:

.*Name:
City: State:  

*Email:

BACK TO TOP

www.TheHomeInspector.com www.DeckFailure.com www.WaterEntry.com www.Diptube.info
www.WaterEntry.com
TheStuccoInspector
DeckFailure.com
TheHomeInspector
DipTube.info
TheCommercialInspector
Michael Leavitt & Co
MLC Inspections
Michael Leavitt & Co Inspections, Inc.
1145 N. Main Street
Orem, Utah 84057
801-225-8020
Michael Leavitt
Michael Leavitt
MLC Guaranteed
Copyright 1997-Present - www.TheHomeInspector.com
E-MAIL US
WEBMASTER
PRIVACY POLICY
real estate